A scheduling solution built for people,

powered by technology

Bringing the factory floor into the digital era

Many factory floors still use outdated, manual scheduling, leading to inefficiencies and reactive problem-solving.

Advanced Scheduling uses automation, data insights, and cloud planning to reduce waste, optimize workflows, and align production with business goals. This minimizes downtime, boosts agility, and maximizes supply chain investments.

Our approach transforms scheduling from reactive to proactive, freeing your team to focus on insight-driven planning and strategic performance gains. Step into a smarter, more optimized way of working.

quote icon

Thanks to Zinata and QAD Advanced Scheduling, we transformed complex scheduling rules into a cloud-based system. It enhanced our scheduling speed, consistency, and facilitated hiring and training of a new scheduler with ease and success.

— Dave Stauffer

Director of Supply Chain, AFP advanced food products llc.

Why manufacturers need Advanced Scheduling

Without a modern scheduling solution, manufacturers face:

  • Inefficient workflows that increase costs and reduce throughput
  • Rigid, spreadsheet-driven scheduling that can’t respond to disruptions
  • Excessive changeovers leading to wasted time and lost productivity
  • Difficulty synchronizing production with demand fluctuations

Zinata’s Advanced Scheduling framework ensures optimized, flexible, and automated scheduling that drives efficiency and resilience.

manufacturing line - advanced scheduling

Two pillars, one goal: Optimized scheduling that works

Product Wheel Design:
bringing predictability & efficiency to Scheduling

 

Product Wheel Design applies lean manufacturing principles to create structured, repeatable production cycles that provide:

Predictable, repeatable scheduling


Establish regular production cycles for greater stability and efficiency across the supply chain.

Fast, intelligent scheduling

Instantly generate and adjust schedules while analyzing time and cost impacts.

Optimized production sequences

Define ideal cycle times, frequencies, and inventory targets to align with business goals.

Automation & 
flexibility

Automate scheduling and common actions to minimize changeovers and quickly adapt to disruptions.

QAD Advanced
Scheduling:
bringing predictability & efficiency to Scheduling

 

QAD Advanced Scheduling capabilities provide a fully integrated, cloud-based scheduling system that allows manufacturers:

Reliable, adaptive scheduling


Ensure plants consistently meet business goals, even amid disruptions.

Seamless integration & execution

Align scheduling with ERP and planning systems for executable, optimized production.

Real-time visibility & control

Communicate live schedules, adjust in real-time, and track production progress.

Smarter resource management

Minimize changeovers, optimize capacity, and proactively address material or resource constraints.

Proven results from leading manufacturers

AFP logo

6%

increase in annual volume

35%

reduction in
overtime

200

major line changeovers eliminated
Nature's Bounty logo

33%

improvement in
OEE

35%

increase in
throughput

$1.5M

total operating savings
per year

check icon

Turn scheduling into a competitive advantage

With Product Wheel Design and QAD Advanced Scheduling, Zinata enables manufacturers to maximize efficiency, minimize waste, and synchronize production with business objectives.  Ready to modernize your scheduling?